|

|
City
of Columbus
Building Services Division
757 Carolyn Avenue
Columbus, Ohio 43224
Phone: 614-645-7433 Fax: 614-645-0333
Website: www.columbus.gov |
From Mark F.
Brumenschenkel- Administrator, City of Columbus Department of Development:
Building Permit Application Process and Fee Schedule: Building
Services Division Effective
Monday, February 25, 2008, the City of Columbus Building Services
Division will implement a new building permit application process
and Fee Schedule specifically designed to save our customers time
and money, including:
-
New
Customer Service Center hours: Monday through
Friday, 9:00 am - 4:00 pm
-
New permitting
database allows for quicker permit application submittal and
fee payment in one easy step.
-
New, easy-to-use
permit application forms - available online at: http://development.columbus.gov/PermitsRegistrationLicenses/index.asp
-
Fee paid at
application submittal will include: submittal and
administrative costs, plan review and approval services, state
surcharges and initial inspections.
-
Additional job
site inspections charged separately on a 'per trip' basis.
-
Scheduling of
inspections online.
-
Some permits
issued over the counter.
-
Permits issued for
roofs, window and siding replacements and decks (replaces
Registration Certificates).
-
Mechanical,
electric and plumbing permits issued over the counter or via
fax with Signature-On-File-Transaction (SOFT) process.
The
Building Services Division thanks you in advance for your patience
in working with us through this transition.
Our their intent is to revamp our permit application and issuance
procedures to allow for a more user-friendly customer service
experience.
Detailed
Submission Procedures: City of Columbus Digital Standards In accordance with the previous Detailed Submission Procedures notification that was distributed on January 3, 2006, the City of Columbus will be fully implementing various city approval processes that shall commence to require the submission of digital information to supplement the existing paper submission requirements. Failure to provide this digital information shall result in the rejection of the associated application, and/or other actions. Details regarding these provisions are available on the City of Columbus website: http://development.columbus.gov/formsandpublications/digital-submission-standards.asp
Supplemental
Specification, CMSC Item 801: Department
of Public Utilities From:
Richard C. Westerfield, P.E., Ph.D. - Administrator, Division of
Power & Water
Date: February 1, 2007 Effective
May 1, 2007 all ductile iron pipe used for the construction of
public water mains shall be wrapped with polyethylene encasement
as per A.W.W.A. C-105. All work necessary to furnish and install
the polyethylene encasement shall be included under Item 801 of
the Construction and Material Specifications, City of Columbus,
Ohio. Plans
given final approval prior to March 1, 2007 without this
requirement noted on the Construction Drawings and/or the
Supplemental Specifications of the Bid Document may be exempted. Please
contact the Water Distribution Engineering Office at 614-645-7677
if you have any questions.
Ohio
Environmental Protection Agency Plan Submittal: Department of
Public Utilities From: City of Columbus, Ohio - Division of Power and Water
Date: February 12, 2007 The
City of Columbus, Division of Power and Water (Water), has entered
into an agreement with the Ohio Environmental Protection Agency (OEPA)
that authorizes the Division of Power and Water (Water) to certify
that water distribution system improvements comply with OEPA
rules, regulations and standards. The agreement, dated June 1,
2006 requires all plans (including Drawer E, CC, Suburban, County
and State) to be submitted to the OEPA. Effective
January 1, 2007 the following are required to be submitted to the
Division of Power and Water (Water) for all plans, as required by
section 6109.07 of the Ohio Revised Code:
-
Review
fee ($175.00) payable to "Treasurer, State of Ohio".
-
Water
Supply Data Sheet and Plan Approval Worksheet (2 copies).
-
Applicable
Project Summary Sheet for Self Certified Plan Review (2
copies).
-
General
Plan on engineering paper (4 full size copies).
-
Technical
specifications (2 copies); if applicable.
-
Appropriate
endorsements (Owner, P.E. plan preparer): as applicable.
-
OEPA
submittal letter.
-
DOPW
OEPA Self-Certification Annual Report Summary Form.
-
CD
of plan shall include both an AutoCAD file and TIFF file in
accordance with current City of Columbus Digital Submissions
Standards.
-
Prepaid
mailer or courier for transmittal to OEPA by the Division of
Power and Water.
|
Ohio
Environmental Protection Agency
Central District Office
P.O. Box 1049
Columbus, Ohio 43216-1049 |
The submittal letter and all other forms are available on the City
of Columbus, Department of Utilities' website at http://utilities.ci.columbus.oh.us/Forms-Permits.htm.
Construction of
projects may not begin unit the OEPA approval letter has been
received.
All plan submittals
shall be directed to Division of Power and Water (Water) reviewing
engineer. Any submittal that is found to be incomplete will be
returned. If you have any questions, please contact the
Division of Power and Water (Water) at 614-645-7677.
|